OUR PROJECTS
Ahtna Construction has enjoyed over 25 years of continuous pipeline services. Our experienced team offers a broad range of services including a strong
background in civil construction projects in Alaska, ranging from
road, highway, trail and bike path construction, heavy and industrial contracting, electrical and mechanical
projects, aggregate material production and crushing and hauling services. Please contact our offices for our Project Database.
The following are recent projects completed by Ahtna Construction:
Chitina Bike/Pedestrian Path
Construct a 2.4 km long bike/pedestrian path adjacent to the Edgerton
Highway in Chitina, AK. This work consists of constructing a 1.6 km
and a .8 km path for the State of Alaska Department of Transportation.
(2008)
Department of Transportation Stockpiles
Production and stockpile 16,000 cubic yards of modified C-1 at MP
2, McCarthy Highway. (2008) Production and stockpile of 5,000 cubic
yards of high float surface aggregate at Tok Cut-Off Rd. (2007) Production
and stockpile of 12,000 cubic yards of high float surface aggregate
at various locations on Richardson Highway. (2007)
Tazlina River Revetment Improvements – Tazlina, Alaska
Placement of 6,500+ cubic yards of Class III and V riprap by extending
the north bank riprap revetment (5 ft of thickness) up stream, wrapping
the end of the Moose Creek drainage as a key to minimize the future
effects of high water in the tributary (2005). An additional 3,000+
cubic yards of riprap was use in revetment work on the south bank.
(2006)
Electrical Work at Valdez Marine Terminal
Reworking the conduit system and installing additional wires to connect
a vibration switch in each of the 56 crude tank mixer motors in the
East Tank Farm.
This new control component will shut down these motors if excessive
vibration occurs, and alert the Operations Control Center (OCC) of the
condition, and which motor has failed. (2005)
Capability Enhancement/Initial Defense Op. Project –
Ft. Greely, Alaska
Installation of 1,860 ft of Concrete Utilidor Structure, and
4,350
ft of electrical and communication duct banks. Provided
excavation and backfill services to install electrical, lighting, and
communication duct banks, man-holes and hand-holes. (2005)