Electrical Work at Valdez Marine Terminal
Reworking the conduit system and installing additional wires to connect
a vibration switch in each of the 56 crude tank mixer motors in the
East Tank Farm.
This new control component will shut down these motors if excessive
vibration occurs, and alert the Operations Control Center (OCC) of the
condition, and which motor has failed. (2005)
Capability Enhancement/Initial Defense Operations Project –
Ft. Greely, Alaska
Installation of 1,860 ft of Concrete Utilidor Structure, and
4,350
ft of electrical and communication duct banks. Provided
excavation and backfill services to install electrical, lighting, and
communication duct banks, man-holes and hand-holes. (2005)
|